Concrete Placement

Casey Hospital Expansion Project

Project Overveiw:
Concrete place and finish - 7 storey

This major expansion includes six new operating theatres. Measuring 7-storeys in height, this project had a zero tolerance on the floor specifications. Project-specific pouring procedures were determined to ensure Ocon got as close as possible to the zero mark. After pouring, our remediation division then came through with level topping services to finish off the floors compliant to the strict specifications.

Completed
Aug 2018
Client
Watpac
Location
62-70 Kangan Drive, Berwick VIC 3806

Take a look at some of our other

recent projects

Volaire Apartments

Ocon was called in to this project to remediate all concrete floors. From the beginning of the investigation phase, a combination of concrete grinding of floors and self-levelling applications was identified as the most cost effective and efficient option. After recognising the task required, Ocon’s remediation team quickly got to work with all floors getting […]
View Project

Elm & Stone Apartments

After a subcontractor poured the structure and left things in a mess, Ocon was called in tosave the day to perform desperately needed remediation works to maintain the program. There were severe issues on this project, with one level being 30mm above the nominated RL. In order to rectify the difference in levels,  Ocon used […]
View Project

M-City

This $750 million mixed-use development is one of the largest projects undertaken outside of the Melbourne CBD, located on 35,000m2 of land.   Ocon’s remediation team was called upon to get the project delivered on time. With severe post-tension deflection issues, Ocon performed extensive floor grinding using state-of-the-art grinding systems which strictly comply to OH&S standards […]
View Project
crossmenu