This major expansion includes six new operating theatres. Measuring 7-storeys in height, this project had a zero tolerance on the floor specifications. Project-specific pouring procedures were determined to ensure Ocon got as close as possible to the zero mark. After pouring, our remediation division then came through with level topping services to finish off the floors compliant to the strict specifications.