Packaged Solutions Projects

Krueger Transport

14,000m2 warehouse, including 8 x mechanical pits – Strip and pad footings, Armour Joint CJ system & Burnished finish throughout - 11,000m2 Hardstand with kerbing barrier.
View Project

Nine Mile (Stage 1)

5,000m2 warehouse, including strip drain system within washing area – Strip and pad footings, Armour joint CJ system & burnished floors – 3000m2 mezzanine bondek slab - 4,000m2 hardstand
View Project

Latrobe Uni

This is one of the first European style CLT timber structure construction in Melbourne. 2 buildings, 6 levels each. Supply and construct 50mm topping slab on a 5mm Regupol acoustic underlay to a CLT structure design. Ocon installed 5mm Regupol acoustic underlay to all floor areas (aprox 12,000m2) and 50mm screed fibre mesh topping slab […]
View Project