Our Projects

Volaire Apartments

Ocon was called in to this project to remediate all concrete floors. From the beginning of the investigation phase, a combination of concrete grinding of floors and self-levelling applications was identified as the most cost effective and efficient option. After recognising the task required, Ocon’s remediation team quickly got to work with all floors getting […]
View Project

Elm & Stone Apartments

After a subcontractor poured the structure and left things in a mess, Ocon was called in tosave the day to perform desperately needed remediation works to maintain the program. There were severe issues on this project, with one level being 30mm above the nominated RL. In order to rectify the difference in levels,  Ocon used […]
View Project

M-City

This $750 million mixed-use development is one of the largest projects undertaken outside of the Melbourne CBD, located on 35,000m2 of land.   Ocon’s remediation team was called upon to get the project delivered on time. With severe post-tension deflection issues, Ocon performed extensive floor grinding using state-of-the-art grinding systems which strictly comply to OH&S standards […]
View Project

PM Apartments

Ocon was engaged by Hutchinson builders to remediate several parts of this concrete structure. Our first challenge was to develop a self-levelling solution for deflection issues caused due to the post-tensioned slab design. An extensive investigation was performed on the existing RL’s and an efficient, cost effective solution was implemented by Ocon. All floors were […]
View Project

Rialto Plaza - Regeneration Project

Concrete place and finish of5,000m2 of commercial office space to the existing prestigious Rialto tower. 
View Project

Trillium Apartments

Concrete place and finish of a 38-storey tower comprising of 221 residential apartments. Given the narrow width of this building and restricted access around the building site, logistical and concrete placement challenges were overcome by Ocon’s contribution of meticulous planning, project specific concrete mix designs, and extensive communication between all stake holders. 
View Project

Elm & Stone

This project consisted of two Basements & two 18-storey buildings towers. Ocon’s extensive recourse reach and field knowledge enabled both towers to be constructed simultaneously and rapidly without sacrificing or compromising quality and OHSE. 
View Project

Scape 393

This 45-storey tower with prefabricated pod ensuites meant there was very little room for error. Through extensive consultation between all stakeholders planning the sequencing of construction and to overcome logistical challenges, this ensured all expectations were not only met but surpassed. In this Project, Ocon delivered in a meaningful, agile and resourceful approach and embraced […]
View Project

Classic East Melbourne

2 level basement & 2 towers (7 & 9 Storey). This project was constructed around the existing Pullman Hotel. Extensive planning by all stakeholders in the initial planning was necessary to ensure the new structure didn’t interfere with the existing hotel that was operational at the time. Ocon offered placement solutions that addressed the specific […]
View Project

M-City

This $750 million mixed-use development is one of the largest projects undertaken outside of the Melbourne CBD. Located upon a 35,000m2 parcel of land, this project consisted of four buildings being constructed simultaneously. Ocon’s extensive resource reach was put to the test with up to 3 concrete pours undertaken in a single day. Planning and […]
View Project

271 Spring Street

Located in the heart of Melbourne CBD, 271 Spring Street is marked to become the new Headquarters for Australian Unity. This structural steel and Bondek structure of 16 levels was a challenging project for all stakeholders. Logistical planning and open communication between contractors was key in the delivery of this project. Ocon Group implemented project-specific […]
View Project

Melbourne Airport Hotel

10-Storey hotel located at Melbourne airport. An extensive OHSE plan was implemented on this project in conjunction with Melbourne Airport and Built. Ocon’s involvement in specific concrete mix designs, and placement and finishing techniques enabled Ocon to overcome the project’s challenges.
View Project

Vic Heart Hospital

Place and finish 10,000m2 basement on grade. With concrete pours of  2,000m2, we deployed ride-on trowel machines, magic screeds, handheld trowel machines and the team to efficiently execute works. Together, we eliminated all challenges and delivered a superior product.
View Project

Frankston Hospital Expansion

This high-quality cancer treatment hospital was a very sensitive project. With zero tolerance on concrete floors, Ocon’s innovative nature gave rise to very specific place and finish procedures implemented on the project. Using state-of-the-art equipment in the cancer wards meant floors were to be delivered with zero tolerance. Upon completion of concrete works, Ocon’s remediation […]
View Project

Albert Redevelopment Retirement Community

18-storey tower consisting of 83 purpose-designed retirement living apartments. Given this project had a small building plate, a line was set up in the core and all pours were performed with a line. Specific pour procedures were implemented around pouring with a line as opposed to a boom.
View Project

Casey Hospital Expansion Project

This major expansion includes six new operating theatres. Measuring 7-storeys in height, this project had a zero tolerance on the floor specifications. Project-specific pouring procedures were determined to ensure Ocon got as close as possible to the zero mark. After pouring, our remediation division then came through with level topping services to finish off the […]
View Project

PM Apartments

The PM Apartments development consists of three individual towers of three different heights: a 13 storey, 14 storey and 17 storey tower. In order to tackle the challenges on this project, meticulous planning and efficient pouring procedures were carefully compiled by Ocon to best address each tower’s nuances. With all three towers being constructed simultaneously, […]
View Project

Vibe Hotel

This 24-storey hotel is located on one of City of Melbourne’s busiest corners. Through undertaking extensive planning with all stakeholders, it was found that the logistics of the concrete pump setup and the supply of concrete was going to become the biggest challenge. By working as a collective, maintaining the flow of communication was key […]
View Project

The Carlson

This 34-storey tower was built on a construction site measuring only 276m2. Due to the constraints, logistical challenges were imminent and this required extensive planning to overcome. Concrete pours were performed by means of line pump all the way up to 34th level. Concrete pour sequencing was implemented specifically for this project, and by using […]
View Project

Moray Street

The 7-storey premium office building located in South Melbourne had moulded perimeter upstands needing careful planning. The placement methods we adopted were unique and innovative. Through the careful planning and innovative approach to placement, the team were successful in delivering a flawless product for Hutchinson Builders.
View Project

Scotch College

In his three level building project, Ocon was tasked with placing and finishing all structural slabs, stairs and Hobs. In addition to this, the 1st & 2nd floor balconies were finished with an exposed aggregate topping slab. Vacuum trucks were utilised for the washing process on the exposed aggregate areas.
View Project

Cabrini Hospital

This 11-storey and four basement Hospital is yet another example of a successfully delivered project in the health sector. Ocon’s innovative approach to concrete construction is continuing to solve the industry's most pressing challenges.
View Project

Car Park Redevelopment

This new inner-city urban square consists of two basements, a ground level and three podiums. With several challenges evident, it was Ocon’s unique ability to understand challenges on a project-specific basis which made delivering this world class result possible. From the technical expertise to the developed place and finish strategies for each and every scenario, […]
View Project

Ettaro Apartments

This 10,000m2 site consisted of two basements and four buildings - separated from ground floor up. Ocon’s recourse capabilities ensured this project was constructed with the four towers construction sites running simultaneously. With up to four concrete pours each day, Ocon’s strategic planning, skilled labour pool, placement, and finishing techniques ensured the successful delivery of […]
View Project

Panorama apartments

Located in Doncaster, this 13-storey and two basement apartment building was delivered seamlessly by Ocon Group. With generous room for movement around the site, logistics were easily managed by the on-site team. Thanks to its type of construction, Ocon implemented its standard methods and processes for an easy, stress-free delivery of the project.
View Project

Lucia Apartments

 Sitting atop Daly Street in the vibrant South Yarra area, the Lucia Apartments are a 19-storey and three basement apartment building. Due to the nature of the transfer slab of the building, Ocon addressed these challenges using innovative placement methods developed in-house by our experienced management team. By thinking a little differently and letting our […]
View Project

MCM Southbank

Positioned in Southbank’s bustling arts precinct,  this architecturally designed 8-storey was a challenging build due to its intricate design. Ocon was efficient and effective in ensuring all planning and methodology was dialled in for project success. 
View Project

Gravity Apartments

The Gravity Apartment was the first 29-storey building in Melbourne’s exciting Fishermen’s Bend precinct. The building itself has a small building plate. This meant it was crucial for Ocon to get the logistical planning and place and finish methodology right - along with ensuring the synergy between concrete supply and pumping was dialled in to […]
View Project

Royal Elizabeth

Situated at the very north of the Melbourne CBD, Ocon was engaged to sprinkle its magic upon this 20-storey tower apartment building. By placing and finishing all horizontal slabs and stairs, Ocon implemented project-specific strategies unique to this project which led to it success.
View Project

Arden Apartments

Located in vibrant North Melbourne, Ocon was engaged to take part in the construction of this majestic 5-storey apartment building. Due to the nature of its straightforward design, the building was delivered efficiently through the use of Ocon’s standard procedures.
View Project

The Point

Situated in Doncaster Hill, this 16-storey Apartment building features 161 apartments with 5 exclusive double story penthouses. Ocon was engaged to conduct all the placement and finishing of the building's floors and stairs. Due to the nature of the building, Ocon’s standard practices were adopted for the successful completion of the project.
View Project

600 Church Street

Situated in Richmond, 600 Church Street is a thoughtfully designed complex with 8-storeys and 5,264m2 of office space. Being located on one of the suburbs’ busiest roads, planning an effective strategy to deal with the logistical and placement challenges was critical to the projects success. By leveraging our teams experience and our innovative approach to […]
View Project

Deakin University

Located at Deakin’s Burwood campus, Adco engaged Ocon’s expertise to construct this 7-storey mixed use building. Due to the standard nature of the building, the project was constructed smoothly through Ocon’s standard place and finish methods.
View Project

Holme Apartments

Located in Collingwood, this 14-storey apartment building features 154 apartments, three offices and a cafe on the ground floor. Ocon was tasked with placing and finishing the buildings horizontal slabs and stairs. In order to meet the pressing schedule, Ocon implemented project-specific place and finish strategies to ensure the projects’ successful completion.
View Project

1060 Carnegie

Located in Carnegie, the ABD Group 11-storey Apartment building offers residents an enviable lifestyle with expansive views over the Melbourne CBD and Dandenong Ranges . Ocon Group was tasked with placing and finishing all  horizontal slabs and stairs in it’s constructions. Due to its unique design, Ocon implemented project-specific strategies to ensure the project was […]
View Project

GEM apartments

Description: Delicately placed in the heart of Williamstown, this 10-storey mid-rise was designed to echo the suburb's rich maritime history. Ocon was tasked with placing and finishing all the buildings horizontal slabs and stairs. Due to its unique design, Ocon implemented project-specific strategies to ensure the project was delivered successfully.
View Project

Krueger Transport

14,000m2 warehouse, including 8 x mechanical pits – Strip and pad footings, Armour Joint CJ system & Burnished finish throughout - 11,000m2 Hardstand with kerbing barrier.
View Project

Nine Mile (Stage 1)

5,000m2 warehouse, including strip drain system within washing area – Strip and pad footings, Armour joint CJ system & burnished floors – 3000m2 mezzanine bondek slab - 4,000m2 hardstand
View Project

Latrobe Uni

This is one of the first European style CLT timber structure construction in Melbourne. 2 buildings, 6 levels each. Supply and construct 50mm topping slab on a 5mm Regupol acoustic underlay to a CLT structure design. Ocon installed 5mm Regupol acoustic underlay to all floor areas (aprox 12,000m2) and 50mm screed fibre mesh topping slab […]
View Project
crossmenu